Electric at Site: No
Distance to Nearest Distribution Electric Line (<69KV): 1,900 feet
Electric Provider: (NWEC) North Western Electric Cooperative/ (AEP) American Electric Power
Distance to Nearest Transmission Electric Line (69KV or greater): 1900
Power Phases: Three Phase
Distance to the electric substation: 4.50 miles
Redundant Power: Yes
Additional Electric Details:
Electric service is not currently on-site but is readily accessible, with distribution lines located approximately 1,900 feet from the property. Nearby infrastructure includes both 7.2 kV and 12.47 kV distribution lines, served by Edon Substation (Feeder Three), featuring .336 ACSR conductor. The site offers an estimated 2.5 MW of excess distribution capacity, supporting a range of industrial and commercial uses.
Transmission-level service is available in close proximity, with a 69 kV line located approximately 1,900 feet from the site. The Edon Substation, situated 4.5 miles away, provides regional support. Redundant power can be achieved through available backup circuit configurations.
Electric service to the site is provided by North Western Electric Cooperative (NWEC) and American Electric Power (AEP), ensuring reliable regional coverage.
Gas at Site: Yes
Distance to Natural Gas Distribution Line: 0 feet
Gas Provider: Ohio Gas Company
Gas Line Size: 3 in
Natural Gas Distribution Line Pressure : 150
Additional Gas Details:
Natural gas service is available in close proximity to the site, with a 3-inch distribution line operating at 20 PSI located nearby. A 4-inch high-pressure steel transmission line (150 PSI) runs along State Route 49, just south of the railroad, and feeds a local regulator station that supplies the community distribution system.
The existing plastic gas main serving the area provides approximately 5 MCFH of available capacity, supporting light to moderate industrial and commercial operations. The presence of both distribution and nearby high-pressure infrastructure offers flexibility for system expansion to meet higher demand requirements.
Water at Site: Yes
Distance to water: 0 feet
Water Provider: Village of Edon
Water Line Size: 6 in
Water Main Pressure: 65 psi
Excess Water Capacity at Site: 100000 GPD
Water Excess Capacity As of Date: 4.16.26
Water Details:
Water service is available on-site, with a 6-inch water main running along the west side of Toner Drive. The system operates at approximately 60–65 PSI, providing reliable pressure for a variety of industrial and commercial applications.
The site offers an estimated 100,000 gallons per day of excess capacity, supporting immediate development needs with room for moderate expansion. Water service is provided by the Village of Edon. The system includes iron and manganese removal treatment; however, the water is not softened.
Sewer at Site: Yes
Distance to Sewer Line: 50 feet
Sewer Provider: Village of Edon
Excess Sewer Capacity at Site: 120000 GPD
Sewer Excess Capacity As of Date: 4.16.26
Sewer Line Size: 4 in
Sewer Type: Gravity
Schedule to Extend Sewer to Site: 120 days months
Waste Water Treatment Provider: Village of Edon
Sewer Details:
Sanitary sewer service is available on-site, with access located at the intersection of Woodville Street and Toner Drive. The site is served by a 4-inch sewer line with approximately 120,000 gallons per day of excess capacity, supporting a range of industrial and commercial uses.
Wastewater service is provided by the Village of Edon. The Village is actively exploring the development of a dedicated sewer line to further enhance service capacity and support future industrial growth in the area.
Fiber Service to Site: Yes
Fiber Provider: Spectrum
Maximum Data Bandwidth: 100 mpbs
Schedule to Extend Fiber to Site: 1 months
Cost to Extend Fiber to Site: $negotiable
Telecom: Yes
Telecom Provider: Frontier